Small Water Turbine Hydro Turbine Kaplan Turbine

Short Description:

Port: Chongqing, China

Production Capacity: 35 Sets/Year
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram
Output Type: AC Three Phase
Size: Medium
Type: Vertical Hydro Generator
Water Head: 2m – 70m
Capacity: 1000kw – 100MW
Runner Material: Zg06cr13ni4mo


Product Detail

Product Tags

Basic Info.

Frequency
50Hz.60Hz

Trademark
LS

Transport Package
Standard Exporting Wooden Box

Specification
Kaplan turbine generator unit

Origin
China

HS Code
8502390010

A. Product Description:
Product Name Kaplan Turbine
Water Head 2m-70m
Capacity 1000kw-100MW

Small Water Turbine Hydro Turbine Kaplan TurbineSmall Water Turbine Hydro Turbine Kaplan Turbine
B. Parts of Projects for Reference:

Outstanding Projects
1 Own 15 patents for Pelton Turbine.
2 Have the capability of calculating and developing the core technology of bucket linear of pelton turbine runner.
 
1 The highest water head pelton turbine till 2018 in Asia 
TianHu HEPP, Guilin, Guangxi (Water Head: 1022.4M, Unit Capacity: 15MW)
2 The four-nozzles vertical shaft set pelton turbine with high water head & high capacity in China
Xiaogou HEPP, Kangding, Sichuan (Water Head: 938M, Unit Capacity: 27MW)
3 The First horizontal six-nozzles set pelton turbine in China
Mahuanggou HEPP, Baoxing, Sichuan (Water Head: 236M, Unit Capacity: 8MW)
4 The Biggest horizontal pelton turbine set till now in China
Lianghekou HEPP, Kangding, Sichuan (Water Head: 432M, Unit Capacity: 15MW)
5 The First vertical five-nozzles set pelton turbine in China
Wangbao HEPP, Jiulong, Sichuan (Water Head: 185M, Unit Capacity: 6.3MW)
6 The First vertical six-nozzles set pelton turbine in China (turbine runner is designed and manufactured by Lisong)
Gequhe II HEPP, Qinghai (Water Head: 374M, Unit Capacity: 27MW)
7 Vertical francis turbine (The distrubitor and runner has not been replaced for 8 years till now).
Furonghe HEPP, Guilin (Water Head: 200M, Unit Capacity: 12.5MW)
Horizontal Single Runner 1 Nozzle Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Xiangling HEPP, Sichuan 2×2500 410 CJA237-W-135/1×10.5 SFW2500-10/1730 2004.01
2 Hejiazhai HEPP, Guizhou 2×3200 535 CJA237-W-125/1×10 SFW3200-8/1730 2004.11
3 Shenyuehe HEPP, Sichuan 2×3200 570 CJA237-W-125/1×9.5 SFW3200-8/1730 2005.01
4 Danikou III HEPP, Sichuan 2×2500 485 CJA237-W-120/1×9.2 SFW2500-8/1730 2005.02
5 Daguan HEPP, Yunnan 2×2500 390 CJA237-W-105/1×11 SFW2500-8/1730 2005.03
6 Menghe HEPP, Sichuan 1×2500 185 CJA237-W-125/1×13.5 SFW2500-14/1730 2007.07
7 Dulanggou II HEPP, Sichuan 2×2500 390 CJA237-W-130/1×11 SFW2500-10/1730 2008.01
8 Hongbagumu HEPP, Sichuan 2×3200 601 CJ1050-W-130/1×9.0 SFW3200-8/1730 2008.06
9 Biaoshuiya HEPP, Yunnan 2×2500 625 CJ1050-W-130/1×8.0 SFW2500-8/1730 2008.07
10 Aijiawan II HEPP, Guangxi 2×3200 516 CJA237-W-120/1×10 SFW3200-8/1730 2009.02
11 Dulanggou I HEPP, Sichuan 2×3000 520 CJA237-W-120/1×10 SFW3000-8/1730 2009.03
12 Lamudai III HEPP, Sichuan 2×2000 423 CJA237-W-110/1×9 SFW2000-8/1730 2009.06
13 Qingshuihe HEPP, Sichuan 2×2000 313.5 CJA475-W-118/1×12 SFW2000-10/1730 2009.07
14 Tuyuhe HEPP, Hubei 2×2000 902 CJ1050-W-120/1×5 SFW2000-6/1430 2009.09
15 Chuba HEPP, Sichuan 2×4000 458 CJ550-W-142/1×12.5 SFW4000-8/2860 2010.04
16 Landong II HEPP, Guilin 3×3200 415 CJ475-W-125/1×12.5 SFW3200-10/1730 2014.05
17 Qingbei HEPP, Guilin 2×2250 273 CJ475-W-110/1×13.5 SFW2250-10/1730 2014.05
18 Bugaotan HEPP, Guilin 2×2250 262 CJ475-W-125/1×14 SFW2250-12/1730 2015.05
19 Sizhishan HEPP, Sichuan 2×1600 294 CJ475c-W-110/1×12 SFW1600-10/1430 2016.02
20 Wayaosanchahe HEPP, Yunnan 2×3200 623 CJ1050-W-133/1×9.0 SFW3200-8/1730 2017.01
21 Dagou HEPP, Sichuan 2×4000 900 CJ1050-W-160/1×7.5 SFW4000-8/1730 2019.01
Horizontal Single Runner 2 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Liyuhe HEPP, Yunnan 2×6300 590 CJA237-W-128/2×9.5 SFW6300-8/2150 2004.11
2 DaihuangGou HEPP, Sichuan 2×4000 440 CJA237-W-110/2×9 SFW4000-8/1730 2004.01
3 Liangchahe HEPP, Sichuan 2×3200 320 CJA237-W-120/2×10.5 SFW3200-10/1730 2005.01
4 Lamahe HEPP, Sichuan 1×5000 685 CJA237-W-140/2×7.0 SFW5000-8/2150 2005.07
5 Hongyan II HEPP, Guizhou 2×4000 486.6 CJA237-W-118/2×8.5 SFW4000-8/1730 2005.12
6 Niujing HEPP, Sichuan 2×3200 315 CJA237-W-120/2×10.5 SFW3200-10/1730 2005.12
7 Jiepaihe I HEPP, Yunan 2×3200 320 CJA237-W-115/2×10.8 SFW3200-10/1730 2006.01
8 Fengdianhe II HEPP, Yunnan 2×6300 870 CJ1050-W-120/2×6.8 SFW6300-6/1730 2007.01
9 Yongxing HEPP, Yunan 2×4000 350 CJA237-W-100/2×10.5 SFW4000-8/1730 2007.11
10 Mugou I HEPP, Sichuan 2×3200 390 CJA237-W-105/2×9 SFW3200-8/1730 2007.12
11 Qingshuihe HEPP, Sichuan 2×3200 220 CJA475-W-116/2×13.5 SFW3200-8/1730 2008.06
12 Bata HEPP, Sichuan 2×5000 375 CJA237-W-128/2×11.5 SFW5000-10/2150 2008.07
13 Chuba HEPP, Sichuan 2×8300 458 CJ325-W-142/2×12.5 SFW8300-10/2600 2008.09
14 Lvshuitang HEPP, Yunan 2×5000 322 CJA237-W-120/2×12.5 SFW5000-10/2150 2008.11
15 Fengxi HEPP, Chongqing 2×3200 271 CJA475-W-110/2×12 SFW3200-10/1730 2008.11
16 Rekuhe II HEPP, Sichuan 2×5000 270 CJA475-W-130/2×14.5 SFW5000-12/2150 2008.12
17 Rekuhe III HEPP, Sichuan 2×6500 321 CJA475-W-140/2×14.5 SFW6500-12/2150 2008.12
18 Pingdenghoushan HEPP, Sichuan 2×5000 316 CJA237-W-118/2×12.8 SFW5000-10/2150 2009.08
19 Shangengzi II HEPP, Sichuan 2×8000 490 CJA237-W-145/2×11.5 SFW8000-10/2600 2009.09
20 Bajiaohe I HEPP, Yunan 3×5000 500 CJ550-W-118/2×9 SFW5000-8/2150 2009.01
21 Zhoubigou II HEPP, Sichuan 2×6300 380 CJ323-W-129/2×11 SFW5000-10/2150 2010.01
22 Huangkunshan HEPP, Sichuan 3×3200 224 CJA475-W-120/2×13.3 SFW3200-12/2150 2011.3
23 Zijihe HEPP, Yunan 3×5000 560 CJ550-W-120/2×8.5 SFW5000-8/2150 2011.05
24 Kazi HEPP, Sichuan 2×6750 295 CJA475-W-137/2×15.5 SFW6750-12/2600 2012.9
25 Haozigou III HEPP, Sichuan 2×8000 490 CJ325-W-145/2×11.5 SFW8000-10/2600 2016.03
26 Haizi II HEPP, Sichuan 2×5000 788 CJ1050-W-149/2×6.5 SFW5000-8/2150 2020.06
27 Longtou HEPP, Sichuan 2×12000 855 CJ1050-W-156/2×9.2 SFW12-8/2600 2020.09
Horizontal Single Runner 3 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Sanchahe HEPP, Sichuan 1×5000 250 CJ325-W-126/3×12.5 SFW5000-12/2150 2015.9
2 Bayi HEPP, Abazhou, Sichuan 2×10000 451 CJ496-W-142/3×11.3 SFW10-10/2600 Producing
3 Longtou HEPP, Ganzizhou, Sichuan 2×10000 615 CJ550-W-132/3×11 SFW10-8/2600 Producing
4 Dabaishu HEPP, Abazhou, Sichuan 2×12000 475 CJ496-W-146/3×11.6 SFW12-10/2860 Producing
Horizontal Double Runners 4 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed 
time
(KW) (M)
1 Huodi HEPP, Sichuan 2×8000 340 2×CJA475-W-122/2×11.2 SFW8000-10/2600 2009.01
2 Ningjiahe HEPP, Xinjiang 2×6000 232 2×CJ322-W-122/2×12.5 SFW6000-12/2150 2009.05
3 Lianghekou HEPP, Sichuan 2×15000 432 2×CJ325-W-139/2×12.3 SFW15-10/2800 2013.2
Horizontal Double Runners 6 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Mafanggou I HEPP, Sichuan 3×8000 236 2×CJA475-W-122/3×11.8 SFW8000-12/2600 2012.8
Vertical 2 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Sanqiutian HEPP, Yunnan 2×6000 460 CJA237-L-146/2×10.5 SF6000-10/2860 2002.11
2 Duoluo HEPP, Sichuan 2×13750 890 CJ1050-L-160/2×9.8 SF12-8/2860 2015.07
3 Tianhu II HEPP, Guilin 2×15000 1022.4 CJ1050-L-170/2×9.5 SF15-8/2860 2015.09
Vertical 4 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Xiaogou HEPP, Sichuan 2×30000 938 CJ1050-L-163/4×9.5 SF30-8/3250 2010.03
2 Nianke HEPP, Sichuan 2×10000 445 CJ325-L-140/4×10 SF10-10/2860 2012.08
3 Yinglin HEPP, Sichuan 2×8500 319.7 CJ325-L-120/4×11.5 SF8500-10/2860 2012.07
Vertical 5 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Wangbao HEPP, Sichuan 1×6300 185 CJ475c-L-145/5×13.5 SF6300-16/2600 2015.5
Vertical 6 Nozzles Pelton Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 BC HEPP, U.S.A 1×5200 228.6 CJ285-L-114.3/6×10 N/A 2011.12
2 Gequhe II HEPP, Qinghai 2×27000 374.2 CJ285-L-155/6×15 SF27-12/3900 2012.08
Francis Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Wangjiahe HEPP, Shaxi 3×3200 160 HLA253-WJ-71 SFW3200-6/1730 2004.01
2 Yunhe HEPP, Guangxi 3×1250 88 HLA339-WJ-60 SFW1250-6/1180 2006.01
3 Dazhanghe II HEPP, Guangxi 1×4000 92 HLJF2503-LJ-88 SF4000-8/2150 2008.03
4 Wanping HEPP, Sichuan 2×4000 152 HLA542-WJ-100 SFW4000-8/1730 2008.07
5 Mujiahewula HEPP, Guizhou 2×1000 61.5 HLA696-WJ-55 SFW1000-6/1180 2008.08
6 Xinglongrize HEPP, Sichuan 2×2500 100 HLD46-WJ-71 SFW2500-6/1430 2008.09
7 Zhuomujiu HEPP, Yunnan 2×2500 178 HLD54-WJ-80 SFW2500-6/1430 2008.09
8 Furonghe HEPP, Guilin 2×12500 200 HLA542-LJ-150 SF12.5-10/2860 2008.11
9 Pingshuijiang I HEPP, Guangxi 2×1600 90 HLD46-WJ-65 SFW1600-6/1430 2009.09
10 Leju HEPP, Guizhou 1× 2500 156 HLD54-WJ-80 SFW2500-6/1430 2010.8
11 Feishuiyan HEPP, Sichuan 2× 1000 120 HLD54-WJ-65 SFW1000-6/1180 2010.06
12 Pingshuijiang I HEPP, Guangxi 2×1600 90 HLD46-WJ-65 SFW1600-6/1460 2011.4
13 Junshan I HEPP, Guilin 2×3200 30.5 HL240-LJ-140 SF3200-20/3250 2014.3
14 Qishuping HEPP, Sichuan 2×1600 165 HL90-WJ-71 SFW1600-6/1430 2015.5
15 Dongtoutian HEPP, Guilin 3×1250 49.6 HLA551-WJ-60 SFW1250-6/1180 2016.12
Kaplan Turbine
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Shiniuzui power plant, Sichuan 2×2000 13 ZDJP502-LH-180 SF2000-24/2600 2008.09
2 Yashui HEPP, Nanning 3×1250 8.5 ZD283/400-LH-180 SF1250-24/2600 2015.3
3 Shuikou HEPP, Nanning 3×1250 8 ZD283/400-LH-200 SF1250-28/2600 2015.4
4 Shuikou HEPP, Nanning 1×900 8 ZD283/400-LH-180 SF900-28/2600 2015.04
5 Tuhuangshui power plant, Sichuan 2×3200 11.9 ZZ660-LH-230 SF3200-28/3600 2010.08
6 Daheba HEPP, Sichuan 2×2500 6 ZZ400-LH-305 SF2500-44/4500 2010.12
7 Zhongjuntan HEPP, Guangxi 2×4500 12.5 ZZ283/400-LH-250 SF4500-28/3900 2015.4
Foreign Projects
No. Name of plant Capacity Head Water Turbine Model Generator Model Completed
 time
(KW) (M)
1 Chile HEPP, Chile 1×1200 190 CJA237-W-92/2×9.2 SFW1200-10/1430 2009.03
2 Ricardo HEPP, Chile 1×2000 188.6 CJ325-W-110/2×11.8 SFW2000-12/1730 2010.05
3 Hidrolenna HEPP, Chile 3×2200 195 CJ325-W-112/2×12 SFW2200-12/2600 2010.01
4 Mancahuara HEPP, Peru 1×1600 248 CJA475-W-105/2×9 SFW1600-12/1730 2010.01
5 PCH HEPP, Peru 1×1680 28 HLA551C-W-105 SFW1680-14/1730 2011.01
6 Additional Capacity, Canada 1×4250 298 CJ475-W-105/1×12.5 Efficiency Improved Runner 2009.05
7 Mears HEPP, Canada 1×3800 311 CJ325-W-100/2×11.5 Efficiency Improved Runner 2012.05
8 BC HEPP, U.S.A. 1×5200 228.6 CJ285-L-114.3/6×10 Efficiency Improved Runner 2011.12
9 Baker HEPP, U.S.A. 1×1650 231 CJ237F-W-670/3×8.0 Efficiency Improved Runner 2019.01
10 Beaver #4 HEPP, U.S.A. 1×1200 278.5 CJ496-W-132.1/1×10.5 Efficiency Improved Runner 2018.02
11 Beaver #3 HEPP, U.S.A. 1×630 102.6 CJ325-W-113/2×10.5 SFW630-20/1430 2018.08
12 Lassen Lodge HEPP, U.S.A. 1×5350 261.2 CJ325-W-143/2×15 SFW5350-16/2150 2015.7
13 Talla Bun HEPP, New Zealand 1×2150 240 CJ325-W-103/2×10.5 SFW2150-10/1730 2010.05
14 CEVHERS I HEPP, Turkey 2×4540 304 CJ325-W-139/2×12.5 SFW4540-12/2150 2009.11
15 CEVHERS II HEPP, Turkey 2×3450 296 CJ325-W-115/2×11 SFW3450-10/1730 2009.11
16 Yasil HEPP, Turkey 2×1600 47 HLA616-WJ-75 SFW1600-8/1430 2010.07
2×800 HLA616-WJ-55 SFW800-6/1180
17 Havva HEPP, Turkey 3×2280 39.87 HLA551C-WJ-92 SFW2280-10/1730 2010.04
18 Georgia International Energy 3×4000 289 CJ322-W-130/2×12.4 Efficiency Improved Runner 2009.01
19 Sanhua Jidian HEPP, Indonesia 2×1800 42 HLA551-WJ-84 SFW1800-10/1730 2009.02
20 Keo Bac HEPP, Vietnam 2×900 304.2 CJ325-W-70/2×6 SFW900-6/1180 2013.05
21 JHANG HEPP, Pakistan 3×5000 403 CJ325-W-135/2×10.5 SFW5000-10/2150 2020.02
22 KHAN-ABAD-II, Afghanistan 3×3467 17.24 ZZD471-LH-185 SFW3467-20/3250 Producing
 
C. Parts of Equipment:
1. 5m Vertical Lathe F
Small Water Turbine Hydro Turbine Kaplan Turbine
2. 10m Horizontal Lathe
Small Water Turbine Hydro Turbine Kaplan Turbine

3. Boring Machine
Small Water Turbine Hydro Turbine Kaplan Turbine
4. 50T Travelling Crane
Small Water Turbine Hydro Turbine Kaplan Turbine

D. Patent Technology
Small Water Turbine Hydro Turbine Kaplan TurbineSmall Water Turbine Hydro Turbine Kaplan Turbine

E. After Market:
LISONG has a powerful team of installation and after-sales service built with experienced engineers, senior technicians and skilled workers. The team are quite skilled with installing, commissioning, maintaining, etc, which helps to built the bridge of reliability and friendship between customers and Lisong.
Normally when you are requiring, please let us know the details as follows, then we can provide the correct price for you.
1. Water head:___m
2. Water flow:___m³/s
3. Unit Capacity: ___kw
4. Number of unit:___set
5. Frequency: 50Hz or 60Hz


  • Previous:
  • Next:

  • Leave Your Message

    Leave Your Message